HOLD4ROM / 3D PRODUCTION FARM

Live Production Capacity

Public 3D Production Capacity

Monitor public hosting capacity, active machines, physical infrastructure and solar-backed production conditions across the Hold4Rom farm.

Positions 60
Installed 24
Active Jobs 6
Available 8
Solar Coverage
0% Live
PV Production 0 W PV Production: 0 W
Local Load 1.01 kW Local Load: 1,010 W
Battery 98%
P01 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P02 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P03 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Build To be published
Next Slot Now
POSITION AVAILABLE
P04 Production Position
STANDBY
Bambu Lab A1 mini

Bambu Lab A1 mini

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
MONITORING
Camera Monitoring Energy Monitoring
Camera Monitoring | Energy Monitoring
Build 180 × 180 × 180 mm
Next Slot Now
P05 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
POWER
Stabilized Power
Stabilized Power
Build To be published
Next Slot Now
POSITION AVAILABLE
P06 Production Position
MAINTENANCE
Prusa MK4S

Prusa MK4S

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
POWER
Stabilized Power UPS Protected
Stabilized Power | UPS Protected
Build 250 × 210 × 220 mm
Next Slot Now
P07 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P08 Production Position
PRINTING
Bambu Lab X1 Carbon

Bambu Lab X1 Carbon

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
SAFETY
Fire Protected
ENVIRONMENT
Air Filtration Fume Extraction
Fume Extraction | Air Filtration | Fire Protected
Current Operation Current progress 13%
13% Complete
Build 256 × 256 × 256 mm
Next Slot 2026-08-16 12:58
P09 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class PROTECTED
POWER
Stabilized Power UPS Protected Remote Power Control
SAFETY
Fire Protected
Stabilized Power | UPS Protected | Fire Protected | Remote Power Control
Build To be published
Next Slot Now
POSITION AVAILABLE
P10 Production Position
MAINTENANCE
QIDI Q2

QIDI Q2

Infrastructure / CLIMATE
Public Booking Shared Position
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
Temperature Controlled | Humidity Controlled | Dry Material Storage
Build 245 × 245 × 240 mm
Next Slot Now
P11 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P12 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class FULL PROTECTED
POWER
Stabilized Power UPS Protected
SAFETY
Fire Protected
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
MONITORING
Camera Monitoring Energy Monitoring
Stabilized Power | UPS Protected | Fire Protected | Temperature Controlled | Humidity Controlled | Dry Material Storage | Camera Monitoring | Energy Monitoring
Build To be published
Next Slot Now
POSITION AVAILABLE
P13 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P14 Production Position
AVAILABLE
Bambu Lab P2S

Bambu Lab P2S

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
Infrastructure Standard Position
Build 350 × 350 × 350 mm
Next Slot Now
P15 Production Position
MAINTENANCE
FlashForge AD5X

FlashForge AD5X

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
POWER
Stabilized Power
Stabilized Power
Build 220 × 220 × 220 mm
Next Slot Now
P16 Production Position
AVAILABLE
Bambu Lab P1S

Bambu Lab P1S

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
SAFETY
Fire Protected
ENVIRONMENT
Air Filtration Fume Extraction
Fume Extraction | Air Filtration | Fire Protected
Build 256 × 256 × 256 mm
Next Slot Now
P17 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P18 Production Position
PRINTING
UltiMaker Factor 4

UltiMaker Factor 4

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
POWER
Stabilized Power UPS Protected Remote Power Control
SAFETY
Fire Protected
Stabilized Power | UPS Protected | Fire Protected | Remote Power Control
Current Operation Current progress 44%
44% Complete
Build 330 × 240 × 300 mm
Next Slot 2026-08-16 10:54
P19 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P20 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
Temperature Controlled | Humidity Controlled | Dry Material Storage
Build To be published
Next Slot Now
POSITION AVAILABLE
P21 Production Position
ERROR
FlashForge Adventurer 5M Pro

FlashForge Adventurer 5M Pro

Infrastructure / CLIMATE
Public Booking Shared Position
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Build 220 × 220 × 220 mm
Next Slot Now
P22 Production Position
OFFLINE
Creality Ender-3 V3 Plus

Creality Ender-3 V3 Plus

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
Infrastructure Standard Position
Build 300 × 300 × 330 mm
Next Slot Now
P23 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P24 Production Position
AVAILABLE
Bambu Lab X2D

Bambu Lab X2D

Infrastructure / FULL PROTECTED
Public Booking Shared Position
Class FULL PROTECTED
POWER
Stabilized Power UPS Protected
SAFETY
Fire Protected
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
MONITORING
Camera Monitoring Energy Monitoring
Stabilized Power | UPS Protected | Fire Protected | Temperature Controlled | Humidity Controlled | Dry Material Storage | Camera Monitoring | Energy Monitoring
Build 350 × 320 × 325 mm
Next Slot Now
P25 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
POWER
Stabilized Power
Stabilized Power
Build To be published
Next Slot Now
POSITION AVAILABLE
P26 Production Position
STANDBY
QIDI Q2C

QIDI Q2C

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
Infrastructure Standard Position
Build 245 × 245 × 240 mm
Next Slot Now
P27 Production Position
PRINTING
QIDI Max4

QIDI Max4

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
POWER
Stabilized Power UPS Protected Remote Power Control
SAFETY
Fire Protected
Stabilized Power | UPS Protected | Fire Protected | Remote Power Control
Current Operation Current progress 53%
53% Complete
Build 325 × 325 × 315 mm
Next Slot 2026-08-16 10:18
P28 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
MONITORING
Camera Monitoring Energy Monitoring
Camera Monitoring | Energy Monitoring
Build To be published
Next Slot Now
POSITION AVAILABLE
P29 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P30 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
Temperature Controlled | Humidity Controlled | Dry Material Storage
Build To be published
Next Slot Now
POSITION AVAILABLE
P31 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P32 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class PROTECTED
SAFETY
Fire Protected
ENVIRONMENT
Air Filtration Fume Extraction
Fume Extraction | Air Filtration | Fire Protected
Build To be published
Next Slot Now
POSITION AVAILABLE
P33 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Build To be published
Next Slot Now
POSITION AVAILABLE
P34 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P35 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
POWER
Stabilized Power
Stabilized Power
Build To be published
Next Slot Now
POSITION AVAILABLE
P36 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class FULL PROTECTED
POWER
Stabilized Power UPS Protected
SAFETY
Fire Protected
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
MONITORING
Camera Monitoring Energy Monitoring
Stabilized Power | UPS Protected | Fire Protected | Temperature Controlled | Humidity Controlled | Dry Material Storage | Camera Monitoring | Energy Monitoring
Build To be published
Next Slot Now
POSITION AVAILABLE
P37 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P38 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P39 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Build To be published
Next Slot Now
POSITION AVAILABLE
P40 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
Temperature Controlled | Humidity Controlled | Dry Material Storage
Build To be published
Next Slot Now
POSITION AVAILABLE
P41 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P42 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class PROTECTED
POWER
Stabilized Power UPS Protected
Stabilized Power | UPS Protected
Build To be published
Next Slot Now
POSITION AVAILABLE
P43 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P44 Production Position
STANDBY
Creality K2 Pro

Creality K2 Pro

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
MONITORING
Camera Monitoring Energy Monitoring
Camera Monitoring | Energy Monitoring
Build 320 × 320 × 350 mm
Next Slot Now
P45 Production Position
OFFLINE
QIDI Plus5

QIDI Plus5

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
POWER
Stabilized Power UPS Protected Remote Power Control
SAFETY
Fire Protected
Stabilized Power | UPS Protected | Fire Protected | Remote Power Control
Build 305 × 305 × 280 mm
Next Slot Now
P46 Production Position
AVAILABLE
UltiMaker S7

UltiMaker S7

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
Infrastructure Standard Position
Build 330 × 240 × 300 mm
Next Slot Now
P47 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P48 Production Position
AVAILABLE
Bambu Lab H2C

Bambu Lab H2C

Infrastructure / FULL PROTECTED
Public Booking Shared Position
Class FULL PROTECTED
POWER
Stabilized Power UPS Protected
SAFETY
Fire Protected
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
MONITORING
Camera Monitoring Energy Monitoring
Stabilized Power | UPS Protected | Fire Protected | Temperature Controlled | Humidity Controlled | Dry Material Storage | Camera Monitoring | Energy Monitoring
Build 320 × 320 × 325 mm
Next Slot Now
P49 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P50 Production Position
AVAILABLE
UltiMaker S8

UltiMaker S8

Infrastructure / CLIMATE
Public Booking Shared Position
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
Temperature Controlled | Humidity Controlled | Dry Material Storage
Build 330 × 240 × 300 mm
Next Slot Now
P51 Production Position
PRINTING
Elegoo Centauri Carbon

Elegoo Centauri Carbon

Infrastructure / CLIMATE
Public Booking Shared Position
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Current Operation Current progress 92%
92% Complete
Build 256 × 256 × 256 mm
Next Slot 2026-08-16 07:55
P52 Production Position
AVAILABLE
Creality K2

Creality K2

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
MONITORING
Camera Monitoring Energy Monitoring
Camera Monitoring | Energy Monitoring
Build 320 × 320 × 350 mm
Next Slot Now
P53 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P54 Production Position
PRINTING
Raise3D RMF500

Raise3D RMF500

Infrastructure / PROTECTED
Public Booking Shared Position
Class PROTECTED
POWER
Stabilized Power UPS Protected Remote Power Control
SAFETY
Fire Protected
Stabilized Power | UPS Protected | Fire Protected | Remote Power Control
Current Operation Current progress 61%
61% Complete
Build 500 × 500 × 500 mm
Next Slot 2026-08-16 09:46
P55 Production Position
AVAILABLE POSITION

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
POWER
Stabilized Power
Stabilized Power
Build To be published
Next Slot Now
POSITION AVAILABLE
P56 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class PROTECTED
SAFETY
Fire Protected
ENVIRONMENT
Air Filtration Fume Extraction
Fume Extraction | Air Filtration | Fire Protected
Build To be published
Next Slot Now
POSITION AVAILABLE
P57 Production Position
PRINTING
Raise3D Pro3 Plus HS

Raise3D Pro3 Plus HS

Infrastructure / CLIMATE
Public Booking Shared Position
Class CLIMATE
ENVIRONMENT
Temperature Controlled Humidity Controlled
Temperature Controlled | Humidity Controlled
Current Operation Current progress 68%
68% Complete
Build 300 × 300 × 605 mm
Next Slot 2026-08-16 09:18
P58 Production Position
OFFLINE
Raise3D E2

Raise3D E2

Infrastructure / STANDARD
Public Booking Shared Position
Class STANDARD
Infrastructure Standard Position
Build 330 × 240 × 240 mm
Next Slot Now
P59 Production Position
OCCUPIED

Hosting Position

No machine assigned No Printer Installed
Available for Installation
Class STANDARD
Infrastructure Standard Position
Build To be published
Next Slot Now
POSITION AVAILABLE
P60 Production Position
AVAILABLE
Prusa XL

Prusa XL

Infrastructure / FULL PROTECTED
Public Booking Shared Position
Class FULL PROTECTED
POWER
Stabilized Power UPS Protected
SAFETY
Fire Protected
ENVIRONMENT
Temperature Controlled Humidity Controlled Dry Material Storage
MONITORING
Camera Monitoring Energy Monitoring
Stabilized Power | UPS Protected | Fire Protected | Temperature Controlled | Humidity Controlled | Dry Material Storage | Camera Monitoring | Energy Monitoring
Build 360 × 360 × 360 mm
Next Slot Now